Send Message
Home ProductsAlloy Steel Pipe Fittings

Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap

Certification
China TOBO STEEL GROUP CHINA certification
China TOBO STEEL GROUP CHINA certification
Customer Reviews
In the latest vendor rating, TOBO won the excellent rating, it is good, will continue to cooperate.

—— Brazil---Aimee

ASTM A213 T9 Alloy steel pipe ,Stable quality , good price, excellent serive, TOBO GROUP is our trustworthy partner

—— Thailand ---Dave Mulroy

I'm Online Chat Now

Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap

Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap
Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap

Large Image :  Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap

Product Details:
Place of Origin: Shanghai(CHINA)
Brand Name: TOBO
Certification: ISO,SGS
Model Number: 001
Payment & Shipping Terms:
Minimum Order Quantity: 10pics
Price: USD13-55/pics
Packaging Details: wooden case
Delivery Time: 7days
Payment Terms: L/C, D/A, D/P, T/T, Western Union
Supply Ability: 10000pics/month

Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap

Description
Model Number: Lb-310S Material: Alloy Steel
Technics: Forged Connection: Welding
Shape: Reducing Head Code: Round
Standards: ANSI / ASME / DIN / JIS/API /GB /ISO Size Range: DN15-DN2400(1/2"-96")
Types: 45 Degree, 90 Degree, 180 Degree,lR,SR Application: Natural Gas, Chemicals, Shipbuilding And So On.
High Light:

butt weld pipe fittings

,

alloy pipe fittings

Inconel 600 602 625 718 Alloy Steel Pipe Fittings SS Elbow Reducer Tee Cap

 

1.Introduction

Inconel 718 bar precipitation sclerosis type of molybdenum alloy containing niobium, nichrome, under

650 ℃ has high strength, good toughness and has good corrosion resistance in high and low temperature

environment.The supply state can be solid solution treatment or precipitation hardening state.

 

2.Chemical composition

  Ni Cr Fe C Mn Si Mo Cu Co Al Ti Nb B P S
MIN 50 17         2.8     0.2 0.65 4.75 0    
MAX 55 21 Margin 0.08 0.35 0.35 3.3 0.03 1.0 0.8 1.15 5.50 0.006 0.01 0.01

 

3.Chemical property

θ/℃ 600 700 800 900 1000
oxidation date/(g/(m2·h)) 0.0176 0.0277 0.0351 0.0961 0.1620

 

 

4.character

• Ending machinability

• Low at 700 ℃ has high tensile strength, fatigue strength, creep strength and fracture strength

• Low at 1000 ℃ has the high oxidation

• Both ends have stable chemical properties at low temperature

• Ending with good welding performance

 

5.Physical property

Density:ρ=8.24g/cm3

Melting temperature range:1260~1320℃

 

carbon steel cross tee

ABOUT US

 We are one of the Professional manufacturers Exporter  Pipeline products  in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicians. We have five branch factories which can supply the best quality pipes, tubes, fittings flanges and related accessories.

 
Our Advantages
 

WHY CHOOSE US

TEAM

More than 120 top-class mills

EQUIPMENT

A number of advanced equipments

QUALITY

Company with a variety of detection devices

FACTORY

We have five branch factories

If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.

If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term cooperated agent also available.

FAQ

FAQ

1.  Are you trading company or manufacturer ?

We are manufacturer ,You can see the Alibaba certification.

2. How long is your delivery time?

Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

3. Do you provide samples ? is it free or extra ?

 Yes, we could offer the sample for free charge but need pay the cost of freight.

4. What is your terms of payment ?

Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

 
Packaging&Shipping

Package:Standard export carton packing.

Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.

 

carbon steel cross tee

Contact Details
TOBO STEEL GROUP CHINA

Contact Person: Ms.

Tel: 13524668060

Send your inquiry directly to us (0 / 3000)