Send Message
Home ProductsSeamless Steel Pipe

ASTM A 179 Carbon Steel Finned Tube High Performance For Heat Exchanger Parts

Certification
China TOBO STEEL GROUP CHINA certification
China TOBO STEEL GROUP CHINA certification
Customer Reviews
In the latest vendor rating, TOBO won the excellent rating, it is good, will continue to cooperate.

—— Brazil---Aimee

ASTM A213 T9 Alloy steel pipe ,Stable quality , good price, excellent serive, TOBO GROUP is our trustworthy partner

—— Thailand ---Dave Mulroy

I'm Online Chat Now

ASTM A 179 Carbon Steel Finned Tube High Performance For Heat Exchanger Parts

ASTM A 179 Carbon Steel Finned Tube High Performance For Heat Exchanger Parts
ASTM A 179 Carbon Steel Finned Tube High Performance For Heat Exchanger Parts ASTM A 179 Carbon Steel Finned Tube High Performance For Heat Exchanger Parts

Large Image :  ASTM A 179 Carbon Steel Finned Tube High Performance For Heat Exchanger Parts

Product Details:
Place of Origin: Shanghai
Brand Name: TOBO
Certification: API, ISO, SGS, BV, CE, PED, KOC, CCRC, PDO, CH2M HILL and etc
Model Number: FI001
Payment & Shipping Terms:
Minimum Order Quantity: 100PCS
Price: Negotiation
Packaging Details: Wooden case or carton case
Delivery Time: 15 work days
Payment Terms: L/C, T/T
Supply Ability: 10000 pcs per month

ASTM A 179 Carbon Steel Finned Tube High Performance For Heat Exchanger Parts

Description
Model Number: Heating Tube Application: Heater Parts, Heater, Cooler
Fin Material: Aluminum Type: Heat Exchanger Tube
Principle: Mixing Heat Exchanger
High Light:

seamless carbon steel pipe

,

seamless galvanized steel pipe

ASTM A 179 carbon steel finned tube for cooler or dryer or heat exchanger parts

 

SEAMLESS FINNED TUBE


Carbon Steel Seamless Pipe Description

Product Name Seamless Carbon steel pipe
Size OD 12.7mm-89mm
Thickness 3mm-15mm
Length SRL,DRL,5.8M,11.8M
Steel Material ASTM A53/A106,API 5L,EN10216,DN162ASTM A179 A192 A210
Steel Grade Grade A,Grade B,Grade C,X42,X52.S235JRH,S355,P265 ect.
Process Hot rolled/hot expansion/cold drawn/cold rolled
Usage High temperature service
Surface Bared Black Painting, Galvanized,Coating
Proctor Plastic cap
Package Bundles, Bulk
Inspection With Hydraulic Testing, Ultrasonic testing or X-ray Test
Certificate ISO9001;2000
Date of Delivery Less Than 15/20/25/30/40/50/60 Days According To The Quantity
Payment: L/C or T/T
Port of Shipment Xingang,China

 

Product previw

ASTM A 179 Carbon Steel Finned Tube High Performance For Heat Exchanger Parts 0

Fin material aluminum, fin thickness 0.25mm~0.8mm, fin pitch 2.3mm~4.5mm, Fin type: Extruded, extruded serrated, any length, ISO9001 quality system certification, CE, used for large air-cooler, heat exchanger, dryer, with high heat transfer and energy conversetion. Good surface and sea worth packing.

 

Finned tubes:
1) Integral Low Finned Tubes
Increase surface area of tubes, Improves efficiency of heat exchangers and more compact size. Inner Fin, Outer Fin or both Inner and Outer Fin are available.
Tube Materials: Copper, Aluminum Brass, Copper Nickel and other Copper Alloy.
Fin Pitch: 19 to 26 Fin Per Inch.
2) Spiral Finned Tubes
We produced Spiral High Finned Tubes base tube material: Copper and Copper Alloy Tubes, Duplex Tubes and other alloy.
Tube Outside Diameter: from 10mm to 50mm
Fin Materials: Aluminum and Copper Mix. tubes.
Length: up to 15 meter.
Fin pitch: 7, 9, 10...13, 14 mm Fin Per Inch.
Fin height: 6mm to 12mm

Carbon steel/Aluminum finned tubes for the air cooler and heat exchange

The parameters and performance are as follows:
1: Technical parameters: The high degree of fin 0-16mm (or outside diameter of fin φ 38.1-φ77m); Pitch of fins 2.3-12mm; Length of finning tube 0.5~ 14m.
2: Single metal rolling finning tube: Pure aluminum 1060 or aluminum alloy 6063.
3: Double metal rolling finning tube: Tube-based protection from the outer layer of aluminum tubes, corrosion-resistant; Tube-based can be made from carbon steel pipe, in addition to, stainless steel tube and copper tube can also be used, as well as titanium alloy tube.

Package: The aluminum finned tubes are well packed in steel frame and polywood.

One Of Reference Drawing

 

FAQ

Q:Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

Contact Details
TOBO STEEL GROUP CHINA

Contact Person: Ms.

Tel: 13524668060

Send your inquiry directly to us (0 / 3000)